Künz GmbH and ABB have secured an order to deliver nine rail-mounted stacking cranes for the terminal expansion of TraPac LLC in Los Angeles, California. This project aims to increase yard capacity and support the long-term development of container handling operations on the U.S. West Coast. The investment ensures that the terminal infrastructure can meet increasing demand while operating as a cohesive and efficient system.
Under the agreement, Kuenz will provide the complete steel structures and mechanical components, while ABB will handle the design, installation, and commissioning of the electrification and control systems. In addition to the new units, ABB will upgrade systems on 29 existing stacking cranes and three rail-mounted gantry cranes to align performance across the fleet. This integration of OEM-agnostic technology is designed to extend equipment lifecycles.
The cranes will be manufactured at Kuenz’s European production facilities, with final assembly taking place in Poland to allow for delivery of fully erected and tested units. The equipment is scheduled for delivery between 2027 and 2028.